Use Case · Transmission
TrueGET

Real capacity in real time, for the whole line.

The lines are there. The capacity is there. Operators simply can't see it. Halophase TrueGET delivers true, continuous thermal conductor ratings across entire transmission routes — unlocking up to 2× throughput from existing infrastructure.

Talk to our team
$2.0M+ USD/km
cost to build new transmission lines
The Problem

Most lines run at half their safe capacity.

Transmission lines carry more power when they're cool and less when they're hot. Without accurate real-time temperature readings, operators throttle capacity to the worst-case scenario. The result: massive stranded capacity across networks that took decades and billions to build.

Converging demand from renewables, AI and EVs means the world must double grid capacity just to keep up — at an estimated cost of $14 trillion USD. New builds take 5–10 years. The fastest, cheapest gigawatts are already in the wires we own.

High voltage transmission tower
The TrueGET Difference

Built for the field, engineered for the grid.

True Thermal Conductor Ratings

Continuous, distributed temperature data across the entire route — not just terminal points or weather proxies.

Precise Fault Detection & Location

Pinpoint emerging hotspots and locate them on the line, before they escalate to outages.

Rapid, Safe Installation

Touchless deployment with no de-energisation required — minimal disruption to operations.

High Field Survivability

Engineered for decades of service in harsh transmission corridors, with edge AI for low-bandwidth telemetry.